Synergizing Traditional Construction Management Practice by Capitalizing on Building Information Modeling (Revit Platform) and 4D Dynamic Scheduling (Sychro 4D Platform)

Contributor(s): Material type: TextTextPublication details: Wah Cantt CUI Wah Bachelor of Science in Civil Engineering 2023Description: Pages 166 12cmSubject(s):
DDC classification:
  • FYP 2019-23 53818
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Copy number Status Date due Barcode Item holds
Thesis/Dessertations/Reports Thesis/Dessertations/Reports COMSATS University Wah Campus FYP 2019-23 (Browse shelf(Opens below)) 53818 Not for loan 10004TP0053818
Total holds: 0

There are no comments on this title.

to post a comment.