Construction project planning and scheduling (Record no. 66199)

MARC details
000 -LEADER
fixed length control field 01809pam a2200265 a 4500
001 - CONTROL NUMBER
control field 0000060951
003 - CONTROL NUMBER IDENTIFIER
control field 0001
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 030805s2004 njua b 001 0 eng
015 ## - NATIONAL BIBLIOGRAPHY NUMBER
National bibliography number GBA3X1107
Source bnb
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9788131766255
040 ## - CATALOGING SOURCE
Original cataloging agency StDuBDS
Modifying agency Uk
042 ## - AUTHENTICATION CODE
Authentication code ukblsr
082 00 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 690.0685
Edition number 22
084 ## - OTHER CLASSIFICATION NUMBER
Classification number 690.0685
Item number PAT-C
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Patrick, Charles,
Dates associated with a name 1956-
245 10 - TITLE STATEMENT
Title Construction project planning and scheduling
Medium [Book] /
Statement of responsibility, etc. Charles Patrick.
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. New Delhi :
Name of publisher, distributor, etc. Dorling Kinderselry,
Date of publication, distribution, etc. c2004.
300 ## - PHYSICAL DESCRIPTION
Extent xv, 204 p. :
Other physical details ill. ;
Dimensions 24 cm.
500 ## - GENERAL NOTE
General note Includes index.
520 ## - SUMMARY, ETC.
Summary, etc. Intended for students and professionals in civil technology/engineering and construction management, Construction Project Planning and Scheduling presents complete coverage of the principles, techniques, and applications of all aspects of the scheduling process. Some of the key features include: Background discussion of the unique nature of scheduling construction projects and the need for sound, proven techniques. Coverage of the development and use of Work Breakdown Structure (WBS) as well as the transition from (WBS) to the elements of the project schedule. Use of real-world examples and applications to reinforce each scheduling principle. Informative illustrations and diagrams to support the text. Discussion of the development of Activity On the Node (RON) diagramming and scheduling techniques with multiple activity relationships.
521 ## - TARGET AUDIENCE NOTE
Target audience note All.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Building
General subdivision Planning.
Topical term or geographic name entry element Production scheduling.
852 ## - LOCATION
Piece designation 44131
-- 300.00
Classification part 690.0685 PAT-C
-- Global~Link Information Services
Sublocation or collection Ground Floor
Former shelving location Books
Copy number 1
Piece physical condition 2-Good
Location JZL-CUI
Holdings
Date last seen Total checkouts Full call number Shelving location Price effective from Koha item type Lost status Damaged status Not for loan Withdrawn status Home library Barcode Current library Date acquired
09/12/2023   690.0685 PAT-C Ground Floor 09/12/2023 Books         Junaid Zaidi Library, COMSATS University Islamabad 44131 Junaid Zaidi Library, COMSATS University Islamabad 09/12/2023